Frame 5 M Turbine, Ten Available, 18 MW, 60 Hz, can be converted, gas fuel, 100 hours since major overhaul, United States, Used.
$600,000 ea.
GE Frame 5 P, Three Available, Model 5341 gas turbines, 50 Hz, Rebuilt with extremely low hours since rebuild, dual fuel, Warranty, United States, Rebuilt.

$5,500,000 ea.

Frame 5 P with HRSG'S and SCR, 26.5 MW, zero houred, 60 Hz can be converted to 50, dual fuel, will burn HFO, United States, Used.

$9,100,000















Power Barges | Siemens Turbine | Heavy Fuel Plants Plants
Frame 5 |
Frame 6 | Frame 7 | Frame 9 | Liquid Fuel
Generator Sets | Mitsubishi Turbine | Mars Turbine
Rolls Royce Turbine | Pratt & Whitney Turbine |
Contact Us

Copyright © 2008 by MegaWattPower.com All Rights Reserved.